An old truck manufacturing facility is transformed into a university building. Existing steel shell is kept and 670 tons of steel is used to form the floors inside the shell. The project is completed in 4 months on turnkey basis including the design phase. The building has various classrooms, offices, laboratories, studios. Building area 13.000 m2